Best iso7 cleanroom factory 2022

Excellent iso 6 cleanroom supplier in China? In order to maintain the required temperature, humidity, wind speed, pressure and cleanliness in the clean room, the most commonly used method is to continuously send a certain amount of treated air into the room to eliminate various heat and humidity interference and dust pollution in the clean room. To obtain the air in a certain state into the clean room, a whole set of equipment is needed to process the air, and it is continuously sent into the room, and part of it is continuously discharged from the room. This whole set of equipment constitutes a clean air conditioning system. Find even more information on iso 6 cleanroom.

Clean air-conditioning system is to control outdoor substances that affect the clean environment of clean rooms, such as dust, smoke, microorganisms, etc. It is a very important part in medical and health, food processing, and microelectronics engineering.

The clean air conditioning system is basically composed of the following equipment:

1. Heating or cooling, humidification or dehumidification and purification equipment;
2. Air conveying equipment and pipelines that send the treated air into each clean room and circulate it;
3. Provide heat, cold, heat source, cold source and piping system to the system.

This specification is designed to manage relevant national guidelines and policies, unify construction acceptance requirements, unify testing workflows, and ensure project top quality, save extra energy, protect the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements.

The clean room workshop is also called the dust free workshop, gmp cleanroom, the industrial clean room (Clean Room) and the dust free room. It refers to the removal of pollutants such as particles, harmful air and bacteria in the air within a certain space, and the indoor temperature,cleanliness, indoor pressure, air velocity and air distribution, noise and vibration, lighting and static control. A specially designed clean room for a particular requirement. That is to say, no matter how the extemal air conditions change, the clean room can maintain the characteristics of cleanliness temperature and humidity and pressure.

In Africa, some area only require cooling system of the air conditioning unit. Especially at island country, the air humidity is very higher 80-90% of year average. For noodles, pasta production factory, the humidity should be control at 30-40%. Like this condition we recommend rotary dehumidifier air conditioner or independent dehumidifier with air conditioner work together.

The detection of air volume and wind speed must be carried out first, and all effects of purified air conditioning must be obtained under the designed air volume and wind speed. Before air volume detection, it is necessary to check whether the fan operates normally, whether all components in the system are installed correctly and whether there are obstacles (such as whether the filter is blocked or blocked). All valves should be fixed at a certain opening position, and the size of the measured air outlet and air duct must be measured. For the turbulent flow clean room, the air supply volume shall be determined by the air outlet method or air duct method. See Item 6, 7 and 8 respectively. For the air outlet without filter, the method in Appendix I of the current national standard code for construction and acceptance of ventilation and air conditioning engineering (gbj243) can be implemented.

As long as you want the clean room project, Suzhou Pharma Machinery Co., Ltd. will realize it for you. Choose a reliable engineering company, Suzhou Pharma Machinery Co., Ltd., will be responsible for your project to the end, and the reputation is guaranteed. Our company has completed 500+ clean room projects all over the world. Many new and old customers like to buy the products they want in our company. The price is reasonable, the integrity is guaranteed, and the after-sales service is good.

Suzhou Pharma engaged in cleanroom turnkey project for many years, HVAC system design and installation is the main part in project. We supply air duct design, AHU solution and installation guide. Before we quote the equipment, the basic data is necessary, such as room clean grade, dimension and height, temperature and humidity request, the local highest/lowest temperature and humidity.

The frame of the clean shed can be generally divided into three types: stainless steel square pass, varnished iron square pass and industrial aluminum profiles. The top and the top can be made of stainless steel steel plate, lacquered cold plastic steel plate, anti-static mesh curtain and acrylic plexiglass and other materials. Anti-static mesh curtains or plexiglass are generally used around, and FFU clean air supply units are used in the air supply unit.

Airflow is the most important factor in controlling cleanliness and temperature and humidity, and it also has some influence on noise. Therefore, the wind speed measurement is the first step in the clean room test. The purpose of the wind speed measurement is to confirm that the air flow sent by the filter meets the design specifications, and the second is to confirm the uniformity of the air flow. In some occasions, due to site restrictions, the indoor ventilation volume must also be converted by multiplying the wind speed by the outlet area. Discover additional info on https://www.sz-pharma.com/.

Governments of various countries have different requirements for clean design conditions, so attention should be paid to government requirements when designing. The choice of refrigerant should pay attention to whether it needs environmental protection type.

The cleanroom advantage include:

1. handmade sandwich panels can always be customized to meet every need,module width, module height are variable dimensions. no need cutout in the Installation site.
2. GMP double layer glass walls can customized.They allow to see into the production process and create a different working atmosphere.
3. LED lights reach UL standard.
4. For special hygiene requirements, our offers higher-quality integrated,hollow-profiles systems that prevent ingress of dire,air dust and moisture. Our design according to ISO14644-1 International standard.
Suzhou Pharma hope that in this new year, we have a new breakthrough in clean room technology, which can help more friends in need.