Pharmacy

Pharma turnkey projects factory from sz-pharma.com

Gmp panel manufacturer and supplier right now: Establish the use of standard operating specifications (SOP) and strict management: Items entering the clean room (aseptic room) basic requirements: All items entering the clean room (aseptic room) must be sterilized with disinfectant on the external surface in the first buffer room, and then sent to the aseptic room through the logistics buffer room, transfer window for more than 1 hour, and sterile air drying. Sterile indoor fixed items shall not be arbitrarily brought out. Personnel entering the clean room (aseptic room) requirements: experimental personnel entering the clean room (aseptic room) shall not make up, wear watches, rings and other jewelry. After cleaning your hands, you should enter the first buffer room and change your clothes. At the same time, you should change your disinfecting slippers, take off your coat, disinfect your hands with disinfectant, put on sterile gloves, change your sterile hoodie (do not expose your hair, clothes, etc.), and put on a sterile mask. Then put on a second pair of sterile gloves, and change a second pair of disinfectant isolation slippers when entering the second buffer room. Then through the air shower room 30s air shower into the sterile room. See more details at pharma turnkey projects.

For the tuyere equipped with filter, the auxiliary air duct can be selected according to the tuyere form, that is, the straight pipe section with the same section as the tuyere and the length equal to twice the side length of the tuyere is made of hard plate, which is connected to the outside of the filter tuyere. The measuring points are evenly arranged on the outlet plane of the auxiliary air duct according to the minimum number of measuring points, and the wind speed of each point is measured with a hot ball anemometer. The air volume is determined by multiplying the average wind speed at the section of the air outlet by the net section area of the air outlet.

Pill stamp press manufacturer and supplier in China: Generally, the air flow distribution point on the surface of the operating table or production equipment should be located at 2/3 of the distance between the clean room space and the partition wall, so that when the operator is working, the air flow can flow from the inside of the process area to the operation area, and the The dust is taken away; if the distribution point is arranged in front of the process area, it will become an improper airflow distribution. At this time, most of the air flow will flow to the process area, and the dust caused by the operator’s operation will be brought to the back of the equipment. As a result, the platform will be polluted, and the yield rate is bound to decrease.

The clean room is generally made of foam color steel or rock wool board with a vertical wall and an independent air-conditioning air supply system. The air is filtered through high-efficiency three-stage filtration in junior high schools. The personnel and materials are equipped with an air shower room and a transfer window for clean filtration.

Suzhou Pharma is one of the leading turnkey project providers for pharmaceutical, food, herbal, cosmetic, electronics factory and chemical plants. We offer projects as per GMP regulations. As being pioneers in this field, the solutions from Suzhou Pharma is readily accepted by the customers. Our solid expertise in cleanroom allows meeting the precise needs of its customer’s industry in different sectors such as health,pharmaceutical, biotechnology, and cosmetics. We firmly believe in the principle of quality by design. Read more info on https://www.sz-pharma.com/.

Because of the different standards and machine styles, the die of tablet press can be divided into single tablet press die and rotary tablet press die. According to different specifications, diameter and tablet shape, the stamping dies of single stamping tablet machine and rotary tablet press can be divided into circular stamping dies and special-shaped stamping dies (triangle, oval, key type, plum blossom, rectangle, etc.), which can be customized according to your needs.

Use a Hygrometer: A hygrometer is a device that measures the current humidity level in the room. By regularly monitoring the cleanroom humidity control with a hygrometer, you can identify any fluctuations and take corrective action if necessary. Ventilation: Proper ventilation is crucial for maintaining healthy humidity levels in clean rooms. Ensure that there are sufficient exhaust fans in place to remove excess moisture and carbon dioxide from the air. Additionally, consider installing temperature and humidity sensors to monitor changes in the environment and adjust ventilation accordingly. Control Water Sources: Closely monitor water sources within the clean room, such as sinks or taps, as they can contribute to high humidity levels. Be sure to turn off faucets when not in use and avoid running water unnecessarily.

The plane and space design of the clean laboratory will arrange the clean experimental area and personnel purification, equipment and material purification and other auxiliary rooms in different areas. At the same time, the comprehensive coordination effects of various technical facilities, such as experimental operation, process equipment installation and maintenance, air distribution type, pipeline layout and purified air conditioning system, are considered.